OUR FUTURE

Watch Biology Building Construction, as it's Happening!

September 2012

September 2012

September 2012

September 2012

September 2012

September 2012

July 2012

July 2012

July 2012

July 2012

July 2012

July 2012

July 2012

July 2012

Back of Building A
(June 14, 2012)

Back of Building A
(June 14, 2012)

Building B, 1st Floor Metal Wall Studs
(June 14, 2012)

Building B, 1st Floor Metal Wall Studs
(June 14, 2012)

Main Entrance into Lobby
(June 14, 2012)





New Aerial Photograph, June 20, 2012

Update 4/26/2012

New photo showing the slab for Building A, completed April 24, 2012. The footings for the field house (animal facility, aquarium facility, insectary, and loading dock), are all visable.

Aerial Photo of Biology Bldg.

The Department of Biology has been approved for a state of the art, LEED certified building. Construction began in 2011, with completion scheduled for 2013.


Read More about the New Biology Building: